Bullet Train Big Update: Route Map with 12 stations released, check names here, trial begins, project to be completed by…

It is important to note that the trials for the train have already begun in Japan, and it is expected to be operational in India by 2026. In this article, we will discuss this mega project and the cities it will pass.

Jun 4, 2025 - 09:30
 0  10
Bullet Train Big Update: Route Map with 12 stations released, check names here, trial begins, project to be completed by…

Bullet Educate Tempo: The Mumbai-Ahmedabad bullet practice, India’s first high-elope rail project, is constantly progressing towards completion. This 508-kilometer-prolonged corridor will journey thru Maharashtra, Gujarat, and Dadra and Nagar Haveli, with a total of 12 stations being constructed along the route. It is a ways required to imprint that the trials for the practice gather already begun in Japan, and it is predicted to be operational in India by 2026. Listed right here, we can focus on this mega project and the cities this can cross.

Which 12 Stations Will the Bullet Educate Trip Through?

Mumbai (Bandra Kurla Complex): This would be the starting position of the corridor

Thane: The position in Thane is proposed shut to Dombivli East

Virar: This would be the third position in Maharashtra, located in the Palghar district.

Boisar: Boisar position will connect nearby industrial areas.

Vapi: The first position in Gujarat, Vapi is a wanted commercial hub.

Bilimora: Located in Navsari district, this position will promote regional tourism.

Surat: A valuable commercial metropolis in Gujarat, Surat will be definitely one of many predominant stops for the bullet practice.

Bharuch: Located on the banks of the Narmada River, this position will toughen industrial development.

Vadodara: Acknowledged as Gujarat’s cultural and tutorial hub, development at this position is progressing rapidly.

Anand/Nadiad: Located in Kheda district, this position may support the agricultural and dairy industries.

Ahmedabad: In most cases in most cases known as the economic capital of Gujarat, the bullet practice position will be shut to Kalupur.

Sabarmati: The final position of the corridor, this is in a position to be constructed-in with the Ahmedabad Metro.

Mumbai-Ahmedabad: All You Want to Know

  • The Mumbai–Ahmedabad High-Tempo Rail (MAHSR) corridor spans roughly 508 km
  • The corridor will inaccurate major hubs in conjunction with Mumbai (BKC), Thane, Virar, and Boisar in Maharashtra
  • In Gujarat the corridor will inaccurate Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad, Sabarmati
  • The corridor is split into two sections, with the Gujarat section covering 348 km and the
  • Maharashtra section spanning round 156 km
  • Underground sections: 21 km
  • Sea tunnel: 7 km
  • Mountain tunnels: 5 km

Union Minister Harsh Sanghavi Shares Substitute

Union Minister Harsh Sanghavi now no longer too prolonged prior to now shared a submit that reads, “India’s first bullet practice position in Surat is practically ready. Trial runs will open next one year, and fat provider is predicted by 2029. Furthermore, 300 km of viaduct work shut to Surat is now entire with the open of a 40-metre fat-span field girder.”

What's Your Reaction?

like

dislike

love

funny

angry

sad

wow